01 · THE 2-DAY TECHNICAL AUDIT — HOUR BY HOUR

A technical audit,
scheduled by the hour.

We publish the whole process. What happens at 09:00, what at 13:00, what lands at 17:30 on day two. The price is fixed and the scope agreed in advance. If something won't fit into two days, we say so before the contract is signed.

Price
from $3,700
VAT included
Duration
2 working days
Mon–Tue or Wed–Thu
Report
30+ pages
PDF + an Excel register
Walkthrough
30 minutes
Video call · the recording is yours
02 · WHEN PEOPLE ORDER AN AUDIT

Three typical situations.

Almost every audit comes down to one of the three reasons below — occasionally just to gauge the state of the system with no particular trigger.

01 //

You inherited the code

You let the contractor go. Before sign-off you need a second pair of eyes: what you've inherited and what it costs to put right.

02 //

You've hit the growth ceiling

You're growing, but releases are rare, servers cost more and the technical debt is felt. You need a map: what to rewrite and what to retire.

03 //

A regulator is asking

An inspection is coming, or a tender with a security section, or a client is demanding a pentest. You need an independent outside assessment, not your own team's verdict.

DAY 01
RECONNAISSANCE

A map of the system. Surface scanning. A daily summary by 17:00.

09:00 ───── 12:00 ───── 15:00 ───── 18:00
09:00→09:30· 30 min[KICKOFF]

Kick-off call

A 30-minute video call. NDA signed → read-only access handed over → scope recorded in the shared chat. Anything outside the scope is flagged explicitly.

artefact: scope.md
who's involved: from you: CTO / founder · 30 min
09:30→10:15· 45 min[SNAPSHOT]

Environment snapshot

We clone the repository, take a read-only dump of the database schema and record version-locked artefacts (lockfile, env names). Nothing in production is changed.

artefact: artifacts.zip · kept for 14 days, then deleted
who's involved: on our own
10:15→11:15· 60 min[WALK]

Architecture walkthrough

Your CTO or lead walks us through the system on a call. We record it for the team (with your consent). We're working out why decisions were made, not judging them.

artefact: architecture-notes.md
who's involved: from you: CTO / lead · 60 min
11:15→12:00· 45 min[INV]

Stack inventory

Versions, licences, end-of-life dependencies, deprecated APIs. We run npm audit, snyk, license-checker and a CVE vulnerability scan.

artefact: stack-inventory.csv
who's involved: on our own
12:00→13:00· 60 min[BREAK]

Lunch

A break. The servers carry on scanning without us.

13:00→16:00· 180 min[OWASP]

OWASP Top 10 sweep

A01 broken access · A02 cryptographic failures · A03 injection · A04 insecure design · A05 misconfiguration · A06 vulnerable deps · A07 auth · A08 software integrity · A09 logging · A10 SSRF. Half automated probes, half manual code review.

artefact: owasp-day1.md
who's involved: on our own · questions in the chat
16:00→17:00· 60 min[DATA-LAW]

Data-protection checklist

Where personal data is stored. Which consents you collect. The processing policy. The operators' register. The notification to the regulator. Cross-border transfers.

artefact: fz152-checklist.md
who's involved: on our own
17:00→18:00· 60 min[SYNC]

Daily summary

Everything found that day goes into the shared chat, split into critical / high / medium / low. A 10-minute check-in with your CTO on whether anything urgent needs acting on outside the audit.

artefact: day1-summary.md
who's involved: from you: CTO · 10 min
DAY 02
DEEP & DELIVER

Deep probes. Report assembly. A walkthrough call by 18:00.

09:00 ───── 12:00 ───── 15:00 ───── 18:00
09:00→11:00· 120 min[RLS]

RLS / DB security

We check every row-level security policy. Indexes, secrets, keys. Test cases: anon → admin table must be false; owner → another owner's data must also be false. Run across the roles × tables matrix.

artefact: rls-matrix.csv
who's involved: on our own
11:00→12:00· 60 min[INFRA]

Infra & deploy

CI/CD pipeline. Secret management. Backups (RPO/RTO). Monitoring and alerting. SLOs. Backup retention. Disaster recovery — whether a plan exists and how well thought through it is.

artefact: infra-notes.md
who's involved: on our own · DevOps questions in the chat
12:00→13:00· 60 min[BREAK]

Lunch

A break.

13:00→14:30· 90 min[PERF]

Performance probes

Core Web Vitals on the key pages. TTFB. Heavy endpoints. Queues. N+1 queries. Not load testing (k6 / Locust) — that's a separate package.

artefact: perf-report.md
who's involved: on our own
14:30→15:30· 60 min[COST]

Cost & ops review

Server bills. Optimisations (we usually find 15–30% of savings). Observability — what you can see and what you can't. Whether an ops runbook exists.

artefact: cost-review.md
who's involved: on our own
15:30→17:30· 120 min[REPORT]

Assembling the PDF report

Every finding into a severity × effort × impact matrix. 30+ pages. An Excel register for import into Jira / Linear. A roadmap proposal (optional).

artefact: audit-{your-product}-2026-XX-XX.pdf
who's involved: on our own
17:30→18:00· 30 min[REVIEW]

Walkthrough call

The PDF goes out an hour before the call so you have time to read it. We go through the critical findings, answer questions and send the recording. The audit is closed.

artefact: call recording · PDF · Excel register
who's involved: from you: CTO / founder · 30 min
05 · WHAT YOU GET

Delivered by 18:00 on day two.

Four artefacts. One price. The full report is included, with no surcharge for an extended version.

PDF

PDF report

30+ pages. Severity × effort × impact. Specific lines of code and the commands to reproduce. On our letterhead.

XLSX

Excel register

Every finding in one table. Filters by severity / effort / category. One-click import into Jira / Linear / Notion.

CALL

30-minute walkthrough

A video call after the PDF lands. We go through the critical findings. The recording and transcript are yours.

MD

Roadmap (optional)

If you ask, a separate document: a remediation sprint, a retainer proposal, or a full-rebuild scenario.

06 · WHAT WE DON'T DO IN 2 DAYS

The boundaries are set.

So expectations don't diverge. Every item below is either a separate package of work or another studio's speciality.

  • ×We don't fix the vulnerabilities. That's a separate sprint.
  • ×We don't pentest production. Read-only review only. Active pentesting is a separate package.
  • ×We don't do load testing (k6 / Locust).
  • ×We don't talk to your customers or users.
  • ×We don't sign NDAs with third parties without agreeing it first.
  • ×We don't deliver the report in Word — PDF only (so it can't be edited).
→ If you need something from this list, say so at the kick-off. We'll point you to a studio or adjust the scope after the audit.
07 · WHAT HAPPENS AFTER

The audit creates no obligation.

You can take the report and carry on by yourself. You can carry on with us in one of three formats. You can hand the report to another contractor — it's written to be readable by an outside team.

01 //2 weeks · from $5,000

Remediation sprint

We take the priority critical and high findings from the report. Fixes with tests. A pull request into your repository.

02 //80 hrs/month · from $6,000/month

Retainer

A permanent pair of senior hands on the product. Two-week sprints. No hidden hours.

03 //6–8 weeks · from $19,000

Full rebuild

If the report showed that rewriting is cheaper than fixing, we rebuild the product on our stack standard.

08 · WHAT IT LOOKS LIKE FROM THE INSIDE

The audit log.

A real fragment. The client name and paths are redacted.

studio@audit — sh
─── DAY 1 · 13:04 · OWASP Top 10 sweep ───
studio audit owasp --scope=api,web --target=████████.com
scanning 247 endpoints · 1342 functions · 12,847 LOC
[A01] broken access — 2 endpoints with no auth middleware · /api/internal/*
[A02] crypto — bcrypt cost=8 (we recommend 12) · 1 place
[A03] injection — 0 SQLi · 1 NoSQL filter without sanitising
[A05] config — Supabase service_role key in the client bundle · CRITICAL
12 findings · 1 critical · 3 high · 6 medium · 2 low
studio audit owasp --export > owasp-day1.md
✓ owasp-day1.md · 4.7 KB · pushed to /shared/audit-2026-05-28/
Ready

Two days. From $3,700. The report by 18:00 on day two.

RUEN